Water leak problem solved! Long sheet embedded pit frame.
A construction method that sandwiches sheet flooring material with a frame, solving problems associated with conventional methods (bloating, peeling, water leakage).
This is a receiving frame for drainage pits used in food factories and kitchens with long sheet flooring finishes. The feature of this frame is that it clamps the long sheet, adopting a new method that solves problems such as bubbling, peeling, and water leakage associated with conventional methods. ■ Features of the Long Sheet Clamping Method - The cut edges of the sheet are not exposed. - Absorbs thermal expansion. - Improves construction quality with a B material flush finish (patented) → Prevents cracking and does not cause water infiltration into the structure. - Water channels are secured between the packing of the piece materials (patented). - Water channels are secured between the packing of the piece materials (patented). For more details, visit here: https://www.chubu-net.co.jp/kenzai/Product/detail/PT187
- Company:中部コーポレーション
- Price:10,000 yen-100,000 yen